Kyle, Texas The Goforth Road project reconstructed Goforth Road from IH 35 NB Frontage Road to Kyle Parkway for the City of Kyle. It involved widening 1.4 miles of existing 2-lane roadway section to a curb and gutter 3-lane section with a center two-way left turn lane...
Houston, Texas LAN developed the TCEC Silver award-winning study for a community in west Houston with well-documented flooding issues. InfoWorks SD was utilized to collectively analyze the existing drainage systems and to identify and prioritize recommended...
Barryknoll Lane Drainage Improvements – TIRZ 17, Memorial City Redevelopment Authority Houston Texas LAN designed dual, 8- by 6-foot reinforced concrete boxes along 2,700 LF of Barryknoll Lane to prevent hundreds of homes from flooding during storm events. The...
Houston, Texas LAN designed two separate detention facilities in northwest Harris County as part of a larger facility-sponsored project to reduce flooding. The two sites total 65 acres and contain several groves of mature oak trees. The design includes a curvilinear...
Buffalo Bayou Erosion Control & Bank Stabilization – Harris County Toll Road Authority Houston, Texas LAN designed approximately 1,400 LF of erosion control and bank stabilization measures to protect the existing bridge columns for the Sam Houston Tollway....