Purgatory Creek Channel Improvements – City of San Marcos San Marcos, Texas LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...
Dacy Lane Phase 1 – Hays County Hays County, Texas Lockwood, Andrews & Newnam, Inc. (LAN) designed this project to convert the substandard roadway from a two-lane rural section to an urban four-lane curb and gutter section with storm drains. The project included...
Houston, Texas LAN designed improvements to an existing detention basin that was not fully utilizing its available capacity while the adjacent neighborhoods were experiencing flooding issues. Through LAN’s innovative design efforts of incorporating existing...
HEC-RAS 2D Modeling Guidelines – Harris County Flood Control District Houston, Texas LAN co-authored the Harris County Flood Controls District’s (HCFCD) 2-Dimensional modeling standards entitled “Harris County Two-Dimensional Modeling...
Little Cypress Creek Subregional Watershed Plan – Harris County Flood Control District Houston, Texas The Harris County Flood Control District (HCFCD) initiated the Little Cypress Creek (LCC) Frontier Program as part of a strategic effort to plan for and...