N. Main Avenue & Soledad Street Improvements – City of San Antonio San Antonio, Texas LAN designed the total reconstruction of 3,434 LF of N. Main Avenue and Soledad Street—two paralleling, multi-modal arterials identified by the City of San Antonio as...
On-Call Engineering Services – San Gabriel Valley Water Company San Gabriel Valley, California LAN is providing on-call engineering and staff augmentation to the San Gabriel Valley Water Company (SGVWC), which provides water utility service to a population of...
Trinity River Water Distribution System Condition Assessment – Coastal Water Authority Houston, Texas LAN performed a condition assessment of 14,800 LF of 96- and 108-inch Prestressed PCCP raw waterline. Based on the results of the condition assessment...
Richland-Chambers Pipeline Lowering – Tarrant Regional Water District Navarro County, Texas During the design of IPL Section 15-1, LAN prepared an expedited design to lower TRWD’s 90-inch diameter Richland-Chambers pipeline to accommodate future IPL...
Integrated Pipeline (IPL) Segment 15-1 – Tarrant Regional Water District Navarro County, Texas The Integrated Pipeline (IPL) Program consists of more than 150 miles of raw water pipeline to connect several North Texas reservoirs in the Tarrant Regional Water District...