Purgatory Creek Channel Improvements – City of San Marcos

Purgatory Creek Channel Improvements – City of San Marcos San Marcos Texas ​LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...

Phase 1B Pipeline – Alliance Regional Water Authority

Phase 1B Pipeline – Alliance Regional Water Authority Caldwell County Texas Lockwood, Andrews & Newnam Inc. (LAN) was selected by the Alliance Regional Water Authority (Alliance Water), as a pipeline engineering consultant for a major water project serving several...

Dacy Lane Phase 1 – Hays County

Dacy Lane Phase 1 – Hays County Hays County, Texas Lockwood, Andrews & Newnam, Inc. (LAN) designed this project to convert the substandard roadway from a two-lane rural section to an urban four-lane curb and gutter section with storm drains. The project included...

Goforth Road Extension – City of Kyle

Kyle, Texas The Goforth Road project reconstructed Goforth Road from IH 35 NB Frontage Road to Kyle Parkway for the City of Kyle. It involved widening 1.4 miles of existing 2-lane roadway section to a curb and gutter 3-lane section with a center two-way left turn lane...