Water Model and Master Plan – City of Conroe Conroe, Texas LAN performed hydraulic modeling related to the City of Conroe’s (City) water transmission and distribution system and developed the City’s current Water master plan. To help the City plan for future...
Trinity River Water Distribution System Condition Assessment – Coastal Water Authority Houston, Texas LAN performed a condition assessment of 14,800 LF of 96- and 108-inch Prestressed PCCP raw waterline. Based on the results of the condition assessment...
Richland-Chambers Pipeline Lowering – Tarrant Regional Water District Navarro County, Texas During the design of IPL Section 15-1, LAN prepared an expedited design to lower TRWD’s 90-inch diameter Richland-Chambers pipeline to accommodate future IPL...
Integrated Pipeline (IPL) Segment 15-1 – Tarrant Regional Water District Navarro County, Texas The award-winning Integrated Pipeline (IPL) Program consists of more than 150 miles of raw water pipeline to connect several North Texas reservoirs in the Tarrant Regional...
Phase 1B Pipeline – Alliance Regional Water Authority Caldwell County Texas Lockwood, Andrews & Newnam Inc. (LAN) was selected by the Alliance Regional Water Authority (Alliance Water), as a pipeline engineering consultant for a major water project serving several...