El Paso, Texas LAN prepared conceptual engineering, preliminary engineering, and final design, and provided construction-phase services for Sun Metro Transit’s first higher-capacity form of transit. The Mesa Corridor, opened in October 2014, is an 8.6-mile, $27.1...
Kewaunee County, Wisconsin LAN was retained by the Green Bay Water Utility to complete design and contract administration for the replacement of split-case centrifugal pumping equipment, incoming electrical feed, motor control center, and control valves to increase...
Genesee County, MI LAN designed an 85-mgd water supply intake system which includes two submerged timber cribs, 7600 feet of intake pipeline (60- and 78-inch), an onshore junction chamber, and a zebra mussel control system. Existing artesian conditions imposed...
Galveston, Texas LAN performed a comprehensive facilities assessment which included detailed engineering, architectural, and facility quality evaluations of all District-owned assets, totaling to 1.5 million SF. The project included a report and an online asset...
High Island Shelter ISD New Construction – Texas General Land Office Galveston County, Texas The High Island Shelter project is a thoughtful blend of a school gymnasium and an emergency shelter. The facility serves both the High Island community as a hurricane...