Frederiscksburg Road Bond Project – City of San Antonio San Antonio, Texas In anticipation of the proposed VIA rapit transit PRIMO bus service along Fredericksburg Road, the City of San Antonio contracted LAN to improve traffic flow and update signal equipment...
Kyle, Texas The Goforth Road project reconstructed Goforth Road from IH 35 NB Frontage Road to Kyle Parkway for the City of Kyle. It involved widening 1.4 miles of existing 2-lane roadway section to a curb and gutter 3-lane section with a center two-way left turn lane...
Barryknoll Lane Drainage Improvements – TIRZ 17, Memorial City Redevelopment Authority Houston Texas LAN designed dual, 8- by 6-foot reinforced concrete boxes along 2,700 LF of Barryknoll Lane to prevent hundreds of homes from flooding during storm events. The...
El Paso, Texas LAN prepared conceptual engineering, preliminary engineering, and final design, and provided construction-phase services for Sun Metro Transit’s first higher-capacity form of transit. The Mesa Corridor, opened in October 2014, is an 8.6-mile, $27.1...
A-train Commuter Rail CMGC Implementation – Denton County Transportation Authority (DCTA) Denton Texas This $300 million CMGC rail project extended commuter rail service 21 miles from DART’s Green Line in Carrollton to downtown Denton. It included 26 miles of...