Full Service Plan Checking – Riverside County Flood Control & Water Conservation District Riverside, California LAN reviews land development plans and provides project compliance with the District’s recommendations for engineering standards approval....
Purgatory Creek Channel Improvements – City of San Marcos San Marcos Texas LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...
Dacy Lane Phase 1 – Hays County Hays County, Texas Lockwood, Andrews & Newnam, Inc. (LAN) designed this project to convert the substandard roadway from a two-lane rural section to an urban four-lane curb and gutter section with storm drains. The project included...
Lumpkin Road Detention Basin – Memorial City Redevelopment Authority TIRZ 17 Houston Texas LAN designed improvements to an existing detention basin that was not fully utilizing its available capacity while the adjacent neighborhoods were experiencing flooding...
HEC-RAS 2D Modeling Guidelines – Harris County Flood Control District Houston, Texas LAN co-authored the Harris County Flood Controls District’s (HCFCD) 2-Dimensional modeling standards entitled “Harris County Two-Dimensional Modeling...