Halls Bayou Implementation Management – Harris County Flood Control District Houston Texas LAN leads the Halls Bayou Bond Implementation Program for the Harris County Flood Control District (HCFCD). Halls Bayou covers 45 square miles with 37 tributaries and a...
General Engineering Consultant (GEC) III – Dallas Area Rapid Transit (DART) Dallas, Texas As part of a joint venture, LAN serves as the GEC for managing the design and construction of DART’s first design-build program—19 miles of light rail infrastructure that...
MoPac Diverging Diamond Interchange – Texas Department of Transportation Austin Texas The Texas Department of Transportation (TxDOT) selected planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) as lead designer for MoPac...
Grand Prairie, Texas The Mountain Creek Wastewater Relief Interceptor (Segment 7 and 8) project includes approximately 20,000 LF of new interceptor up to 84-inches in diameter, designed along Fish Creek in Grand Prairie. This project was implemented to replace an...
Phase 1B Pipeline – Alliance Regional Water Authority Caldwell County Texas Lockwood, Andrews & Newnam Inc. (LAN) was selected by the Alliance Regional Water Authority (Alliance Water), as a pipeline engineering consultant for a major water project serving several...