Water Master Plan & System Planning – City of Buda, Texas Buda Texas LAN developed the Buda Water Systems Model for existing capacity analysis. As part of the project, a 2025 water systems model was created and analyzed to identify improvements needed to support...
Halls Bayou Implementation Management – Harris County Flood Control District Houston Texas LAN leads the Halls Bayou Bond Implementation Program for the Harris County Flood Control District (HCFCD). Halls Bayou covers 45 square miles with 37 tributaries and a...
Water Model and Master Plan – City of Conroe Conroe, Texas LAN performed hydraulic modeling related to the City of Conroe’s (City) water transmission and distribution system and developed the City’s current Water master plan. To help the City plan for future...
Purgatory Creek Channel Improvements – City of San Marcos San Marcos Texas LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...
96-Inch Waterline Condition Assessment – City of Houston Houston, Texas LAN performed an internal condition assessment for 15,000 LF of 96-inch PCCP water transmission main to identify areas requiring repair or improvement. The transmission line is part of the...