Bayport Phase 1 Rail Spur – Port of Houston Authority Houston Texas LAN designed a 7,000 foot rail line to provide rail service into the Port of Houston Authority’s future Bayport Intermodal Yard. This line is the first in a multi-line corridor that will connect...
Bolivar Ferry Emergency Evaluation – Texas Department of Transportation Galveston Texas After Hurricane Ike damaged all three docks on the Galveston-Bolivar ferry crossing, LAN performed an emergency evaluation of the requirements to restore normal service....
Timbalier Island Restoration – Louisiana Department of Natural Resources Timbalier Island , Louisiana The Timbalier Island Dune/Marsh Restoration Project was a coastal restoration project to rebuild approximately 200 acres of beach, dune and marsh habitat along...
Houston, Texas LAN designed the North and South portions of the Bayport Terminal Container Yard 6, which totals 44.4 acres. Design improvements included all elements required for a complete and functioning yard, including site fill and grading, drainage, site...
Freeport, Texas LAN designed a 450-foot extension of the existing Berth 5 Wharf to facilitate the loading and unloading of cargo ships for a range of sizes and tonnage. The wharf extension and backland space directly adjacent will include civil and electrical utility...