Galveston, Texas LAN provided a comprehensive site evaluation, identification of alternative restoration methods, consideration of permit requirements, and final design for the Port of Galveston’s Pier 19. The redesign of this area, which serves as a home port...
Freeport, Texas LAN prepared the Master Plan and designed Phase 1 and portions of Phase 2 for Port Freeport’s Velasco Terminal. At build-out, this new terminal will emcompass approximately 90 acres of container and general cargo storage facilities fronted with a...
Freeport, Texas LAN prepared the Gate 12 Master Plan to serve the Port’s expanding Velasco Terminal. An iterative planning and analysis process was utilized by LAN to establish the requirements of the facility, develop options, and refine the preferred option....
Wylie, Texas LAN provided preliminary engineering, final design, bid preparation, and construction phase services for the expansion of the wastewater treatment plant from 5.0- to 10.0-mgd, including the influent lift station, primary clarifiers, aeration basins,...
72-Inch Force Main Design – Miami-Dade Water and Sewer Department Miami, Florida Following the catastrophic failure of an existing 72-inch force main, LAN was selected to assist the Miami-Dade Water and Sewer Department (MDWASD) as owner’s representative...