Galveston, Texas The City of Galveston experienced significant and widespread damage to much of its existing infrastructure as a result of Hurricane Ike, which greatly impacted the City’s ability to provide basic water and sewer service to its residents. In...
Conroe, Texas With the mandated groundwater reduction requirement, LAN has been working with the City of Conroe (City) since 2010 to identify necessary system changes and needs to implement the use of surface water into their system. Six of the City’s existing water...
Austin, Texas City of Austin water customers in the Northwest Hills neighborhood consistently experienced low water pressure. To address this, LAN performed hydraulic modeling to analyze this problem and recommend a cost-effective solution. LAN and Austin Water...
Kewaunee County, Wisconsin LAN was retained by the Green Bay Water Utility to complete design and contract administration for the replacement of split-case centrifugal pumping equipment, incoming electrical feed, motor control center, and control valves to increase...
Genesee County, MI LAN designed an 85-mgd water supply intake system which includes two submerged timber cribs, 7600 feet of intake pipeline (60- and 78-inch), an onshore junction chamber, and a zebra mussel control system. Existing artesian conditions imposed...