108-inch Northeast Transmission Line, Contract 99C-1 – City of Houston Houston, Texas As part of a joint venture between the City of Houston and North Harris County Regional Water Authority, LAN designed 6,200 LF of 108-inch waterline with valves and...
Sheldon ISD Hurricane Harvey Damage Assessment Houston, Texas Sheldon ISD is one of the many school Districts across the Houston area that was affected by the flooding caused by Hurricane Harvey. In the aftermath of Hurricane Harvey, Sheldon ISD was in need of...
Aransas County, Texas LAN is currently assisting Aransas County with the development of a FEMA grant application and development of a county-wide Hazard Mitigation Action Plan (HMAP), which includes unincorporated Aransas County and the cities of Rockport, Aransas...
El Paso, Texas LAN prepared conceptual engineering, preliminary engineering, and final design, and provided construction-phase services for Sun Metro Transit’s first higher-capacity form of transit. The Mesa Corridor, opened in October 2014, is an 8.6-mile, $27.1...