Purgatory Creek Channel Improvements – City of San Marcos San Marcos, Texas LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...
Richland-Chambers Pipeline Lowering – Tarrant Regional Water District Navarro County, Texas During the design of IPL Section 15-1, LAN prepared an expedited design to lower TRWD’s 90-inch diameter Richland-Chambers pipeline to accommodate future IPL...
Integrated Pipeline (IPL) Segment 15-1 – Tarrant Regional Water District Navarro County, Texas The award-winning Integrated Pipeline (IPL) Program consists of more than 150 miles of raw water pipeline to connect several North Texas reservoirs in the Tarrant Regional...
Union Pacific Safety Zone Project – City of Ennis Ennis Texas The City of Ennis identified the need for engineering, surveying, railroad coordination, and project management for the development of a safety zone along the Union Pacific Railroad (UPRR) between the...
96-Inch Waterline Condition Assessment – City of Houston Houston, Texas LAN performed an internal condition assessment for 15,000 LF of 96-inch PCCP water transmission main to identify areas requiring repair or improvement. The transmission line is part of the...