North WWTP Administration Building – City of Conroe

Conroe Texas

The City of Conroe North WWTP Administration Building was irreparably damaged during hurricane Harvey. LAN evaluated two options and performed a conceptual design and construction cost estimate for both:

  • Option A: Replace the building with a new elevated structure near the existing location
  • Option B: Renovate the space above the plant blower equipment in an existing elevated building that had been used for belt presses and was currently empty

The City opted for the second option. LAN, a member of a Design Build team, designed the 10,000 SF space for the new Administration Building. LAN provided programming and architecture to capture the city’s requirements along with ensuring the repurposed space met all code requirements. LAN provided all design and engineering services for the new space which includes an elevator, a new lab area, break and conference rooms, offices, and other supporting spaces.

At a glance

10,000 SF Administration Building

Renovation and interior build-out

Hurricane Harvey recovery project

Features

Office space

Conference rooms

Lab area

Supporting spaces

Services

Architecture

Programming

Interiors

MEP

Structural

Client

City of Conroe