Master Drainage Plan & GIS – City of Beaumont Beaumont Texas LAN developed this three-phase master drainage plan covering over 100 square miles of contributing area, 525 miles of open channel, and 800 miles of storm sewer to guide future drainage...
Stormwater Master Plan – City of Galveston Galveston Texas LAN is currently developing a City-wide master drainage plan covering more than 64 square miles of contributing drainage area on Galveston Island, including 63 miles of storm sewer and 22 miles of cross...
Purgatory Creek Channel Improvements – City of San Marcos San Marcos, Texas LAN performed a watershed scale drainage study, modeling, improvement evaluation, and preliminary engineering design for a two-mile section of a flood control improvement project on...
Richland-Chambers Pipeline Lowering – Tarrant Regional Water District Navarro County, Texas During the design of IPL Section 15-1, LAN prepared an expedited design to lower TRWD’s 90-inch diameter Richland-Chambers pipeline to accommodate future IPL...
Integrated Pipeline (IPL) Segment 15-1 – Tarrant Regional Water District Navarro County, Texas The award-winning Integrated Pipeline (IPL) Program consists of more than 150 miles of raw water pipeline to connect several North Texas reservoirs in the Tarrant Regional...