Trinity River Water Distribution System Condition Assessment – Coastal Water Authority Houston, Texas LAN performed a condition assessment of 14,800 LF of 96- and 108-inch Prestressed PCCP raw waterline. Based on the results of the condition assessment...
Richland-Chambers Pipeline Lowering – Tarrant Regional Water District Navarro County, Texas During the design of IPL Section 15-1, LAN prepared an expedited design to lower TRWD’s 90-inch diameter Richland-Chambers pipeline to accommodate future IPL...
Integrated Pipeline (IPL) Segment 15-1 – Tarrant Regional Water District Navarro County, Texas The award-winning Integrated Pipeline (IPL) Program consists of more than 150 miles of raw water pipeline to connect several North Texas reservoirs in the Tarrant Regional...
Phase 1B Pipeline – Alliance Regional Water Authority Caldwell County Texas Lockwood, Andrews & Newnam Inc. (LAN) was selected by the Alliance Regional Water Authority (Alliance Water), as a pipeline engineering consultant for a major water project serving several...
Wallace Street Pump Station Decommissioning & Ground Storage Tank Rehabilitation – NTMWD Garland, Texas LAN was hired by the North Texas Municipal Water District to design a redevelopment of their Wallace Street pump station and ground storage tank. The...